Newsletter Chris Nunez Newsletter Chris Nunez

TeraWulf Hawesville AI Campus: Fiber and RFP Watch

TeraWulf has signed a definitive EPC contract with Fluor to build three data-center buildings at its Justified Data Campus in Hawesville, Kentucky, on the former Century Aluminum smelter site along the Ohio River. Anthropic has a 20-year lease for about 401 MW of critical IT load across all three buildings, construction is already underway, and the first capacity is due in late 2027. Here is what the filings and local updates say, and what telecom and fiber teams should watch next.

Read More