TeraWulf Hawesville AI Campus: Fiber and RFP Watch
TeraWulf has signed a definitive EPC contract with Fluor to build three data-center buildings at its Justified Data Campus in Hawesville, Kentucky, on the former Century Aluminum smelter site along the Ohio River. Anthropic has a 20-year lease for about 401 MW of critical IT load across all three buildings, construction is already underway, and the first capacity is due in late 2027. Here is what the filings and local updates say, and what telecom and fiber teams should watch next.
SpaceX Dec. 9: Cochise AZ and Starbase TX Hearings
On December 9, 2026, SpaceX-linked compute campuses face public hearings the same day—one a special-use vote in Cochise County, Arizona, and one a tax-abatement hearing in Starbase, Texas. Here is what the filings say, how the sites compare, and what telecom and fiber teams should watch next.
SpaceX Starbase Super-Compute: Fiber and RFP Watch
The City of Starbase will consider a Chapter 312 tax abatement on December 9 for SpaceX’s proposed gas-fired power plant and super-compute facility on about 444 acres near the Port of Brownsville. Here is what the public notice says, and what telecom and fiber teams should watch next.
Illinois DIA Pricing: E-Rate Median MRC by Speed Group
Map4’s October 23, 2026 Illinois E-Rate pricing snapshot puts the 1G median MRC at $800 per month. Compare provider-level medians by speed group and use them to inform your next DIA proposal or broadband budget.
E-Rate RFP Alerts: Daily Telecom Leads Near Your Fiber
Map4 now screens new E-Rate, Rural Health Care and state RFPs against your fiber routes every weekday and emails you what’s nearby. Plus Relay AI testing and this month’s telecom RFP trends.
National Fiber Map for Telecom RFPs + Map4 Relay Launch
Map4 Relay, a LinkedIn productivity tool for B2B sales reps, is live. Plus the Map4 National Map, a national fiber and broadband layer built for sales and proposal teams.
