WaTech Opens a Second Ethernet RFQ: 27-RFQ-019 Due Dec. 14

Washington's state IT agency has a second Ethernet bid open for December. This morning we covered 27-RFQ-018, which closes Dec. 2. On Nov. 18, Washington Technology Solutions (WaTech) released 27-RFQ-019, a new request for wireline Ethernet or fixed wireless service at three state sites. Responses are due Dec. 14, 2026 at 12:00 p.m. Pacific (3:00 p.m. ET).

Who can bid

This RFQ is not open to every carrier. The RFQ says it is mandatory to have a signed WaTech Network Services Agreement (NSA) plus the Wireline Ethernet Technical Addendum and/or the Fixed Wireless Technical Addendum. Responses from contractors without both will be disqualified. The same rule applies to the pre-proposal call: callers without an executed NSA will be removed. WaTech says carriers seeking an NSA should contact the RFQ coordinator separately.

The three sites

The Appendix A cost model on WaTech's procurement page lists:

  • 200 Mbps at a Washington State Parks site at 11838 Tilley Road S., Olympia, with a 150-day guaranteed install interval

  • 300 Mbps at a State Parks site at 220 North Walnut Street, Burlington, also 150 days

  • 1 Gbps at the new Steilacoom Creek State Hospital building, 9601 Steilacoom Blvd SW, Lakewood, for the Department of Social and Health Services (DSHS), with a 180-day interval

The DSHS line is a new circuit, and the customer asks for completion by March 2027 if possible. DSHS requires existing pathways and the vendor's installation drawing before work starts, and the building owner won't allow equipment mounted more than six feet above the ground on the exterior. Both Parks sites need advance notice for site visits and Parks pre-approval for any ground disturbance. WaTech's Amendment 1, also released Nov. 18, adds site drawings for all three locations.

How bids are scored

Each site is scored out of 100 points:

  • Local loop: 40 points for fiber, 20 for fixed wireless, 10 for copper

  • Cost: 50 points, based on the NRC plus 24 months of MRC, with the lowest price getting full points

  • Install timeline: 10 points, with the shortest guaranteed interval getting full points

Bidders must also price at least one supplemental bandwidth option per site, or that site is disqualified. Quotes are a firm offer for 90 days after the award announcement. WaTech also requires bidders to raise permitting, site or install-interval problems during the question period.

Why it matters for telecom sellers

  • Fiber wins on points. A fiber loop starts 20 points ahead of fixed wireless at every site, more than the entire timeline score.

  • Two RFQs, two calendars. 27-RFQ-018 closes Dec. 2 and names winners Dec. 9. 27-RFQ-019 closes Dec. 14 and names winners Dec. 18. NSA holders with fiber near Olympia, Burlington or Lakewood should plan for both.

  • No NSA, no bid. WaTech has now posted three Ethernet or fixed wireless RFQs since Oct. 21. If you sell in Washington and don't have an NSA, ask WaTech about one before the next round.

Key dates

All times are Olympia, Washington (Pacific) time.

  • Nov. 18: RFQ, cost model and Amendment 1 released

  • Dec. 1, 12:00 p.m. PT (3:00 p.m. ET): Final questions due

  • Dec. 3: WaTech's final written answers

  • Dec. 4, 10:00 a.m. PT (1:00 p.m. ET): Pre-proposal conference on Microsoft Teams (NSA holders only)

  • Dec. 10, 12:00 p.m. PT: Complaints due

  • Dec. 14, 12:00 p.m. PT (3:00 p.m. ET): Responses due

  • Dec. 18: Apparently successful vendor(s) announced

  • Dec. 28: Earliest expected statement of work

State bids like this one appear as pins on the Map4 National Map, next to the fiber routes that could serve them.

Sources

Related: Telecom Bids Closing Dec. 2-4: Ethernet, LEO Satellite and AI Space